1.    MEETING CALLED TO ORDER

 

2.    APPROVAL OF AGENDA­

16-04-ADJ-

NOW THEREFORE BE IT RESOLVED that the agenda for the April 15th, 2016 Committee of Adjustment hearing be approved.

3.    DISCLOSURE OF CONFLICT OF INTEREST

4.    ADOPTION OF MINUTES

16-04-ADJ-

NOW THEREFORE BE IT RESOLVED that the minutes of the Committee of Adjustment hearing held on March 18th, 2016, be approved as circulated.

 

5.    DELEGATIONS

Nil

6.    HEARING OF APPLICATIONS

i)    DALGLISH, Geordie – APPLICATION NO. A03-16

Island B-962 (Divided Island), being Parcel 9792
in front of the geographic Township of Shawanaga
Pointe au Baril Islands Neighbourhood
CIVIC ADDRESS:  1-B962 Island

PURPOSE AND EFFECT OF THE APPLICATION:

The applicant is seeking relief from Section 6.1.3 d) ii) Maximum Total Floor Area, of the Township’s Comprehensive Zoning By-law No. A2000-07, as amended.  The maximum total floor area allowed for a main dwelling is 300 square metres (3229 square feet).

The purpose of the proposed application is to allow a variance of 52 square metres (560 square feet) from the maximum total floor area.  The effect of the proposed variance would be the construction of a main dwelling having a maximum total floor area of 352 square metres (3789 square feet).

Originally, the owner had applied for a building permit which included drawings for a 100 square metre (1076 square feet) covered porch, on a portion of the 195 square metre (2099 square feet) main dwelling.  He stated that the architectural vernacular of the dwelling would be maintained if he would be able to construct the 57 square metre (614 square feet) covered porch around the remaining portion of the dwelling, as shown on the attached sketch.

ii)    LESIAK, Anthony and Alison – APPLICATION NO. A04-16

Concession 4, Part Lot 31, LOC JH-16
including Part 1 on Plan 42R-8409
designated as Parcel 8431 PSSS
in the geographic Township of Conger
Healey Lake Neighbourhood
CIVIC ADDRESS:  387 Healey Lake Water

PURPOSE AND EFFECT OF THE APPLICATION:

The owners are seeking relief from Section 5.1.2 ii) a) of the Township's Comprehensive Zoning By-law which stipulates that accessory buildings shall not exceed one storey and 5 metres in height.

The purpose of the proposed application is to allow for a gazebo having a maximum height of 6.0 metres (19.7 feet).  The effect of the proposed variance would be the construction of a 34.8 square metre (375 square feet) gazebo which would require a 1 metre (3.3 feet) variance from the allowed 5 metre height restriction.

7.    CORRESPONDENCE

Nil

8.    UNFINISHED BUSINESS

Nil

 

9.    ADMINISTRATION

Nil

10.   ADJOURNMENT

16-04-ADJ-

NOW THEREFORE BE IT RESOLVED that the Committee of Adjustment hearing of April 15th, 2016, be discontinued at ___________ .